Boring job problem, pictures, information. We decided to show our worst jobs, everyone can show the nice ones. This one's a Well's Water line and electric line.
Tough bore on "City or Municipal Water Service, ground water troubles, and locate off in concrete wall.

Basically this is what we do:
Call '262-639-6494'or'262-652-5600' for more information.

Pricing for Racine and Kenosha Counties, Water Well & Municipal water.

  • Trenching 1" Water Services - $10 to $15 a foot. $800 minimum.
    Trench New Water Service with Our Case Loader Backhoe or 3 ton Mini-Excavator *approx.12"(16" w/mini) wide above ground, backfill from crub-stop to home, install pipe and connect it at the curb-stop, come into the house and install a shut off valve on the end of the water line. Cement up hole in basement water tight. (Well water and city water both apply.)
    *Wider trenchs at building wall and curb-stop. Does not include winter, emergency, or water leaks.

  • Boring New Water Services - $20 to $25 a foot. $1500 minimum.
    Dig trench by crub-stop approx. 3 ft by 4 ft,(or as needed to connect to stop) bore line to home upto approx. 114 ft, pull back pipe from home, connect line at crub-stop, install shut off valve in home, backfill hole by crub-stop. Close-up hole with water tight cement in basement floor or wall as needed.
    *It is always possible that debris underground could stop the process, causing potholing or trenching to finish the bore.

    "The above based on 1 inch lines of 200 p.s.i. Poly Pipe."
    (160 P.S.I. for water wells)
    Does not include winter, emergency, or water leaks

    *Potholing is: Digging up at the end of the last bore, to install the boring machine to continue boring. Potholes are needed for lengths over 100 ft or so, and incase of impassable material.

  • More Prices to follow as time allows....
    --------------------------------------------------------------------------------